Custom Corrugated Shippers
Corrugated shippers are the outer protection for heavier or multi-item orders and for trans-Pacific freight. In E, B or BC flute, they stack well, protect in transit, and can still carry full-colour print when the shipper is also the unboxing.
Choose the flute and board by product weight and transit conditions, and add a divider or insert where items need to stay apart. Tell us the product size and weight, and we will confirm the structure with a free dieline before production.
Specifications
| Minimum order | From 100 pieces |
|---|---|
| Production lead time | 10–15 days |
| Materials | E-flute, B-flute and kraft corrugated board; E, B or BC flute |
| Printing | Full-colour offset printing, inside and outside where the style allows |
| Finishes | Matte and gloss lamination, foil stamping, spot UV, embossing and debossing, soft-touch lamination |
| Samples | Blank samples free; printed proofs in 3–5 working days, customer covers courier |
| Shipping | Sea to Los Angeles / Long Beach about 15–20 days; air 5–7 days; EXW, FOB and DDP available |
Best for
- Heavier products and multi-item orders
- E-commerce orders that need outer protection
- Freight and trans-Pacific shipments
- Brands that want print on the outer shipper as well
How to order
- Send the inside dimensions (length × width × height), material, printing, finish and quantity.
- We build the structural dieline free within 24 hours.
- Approve a blank sample, or a printed proof in 3–5 working days.
- Production runs, then the order ships EXW, FOB or DDP to the US.
Frequently asked questions
What is the minimum order for custom corrugated shippers?
Corrugated shippers start at 100 pieces. A single sample can come first, so you can check size, strength and print before mass production.
Which flute should I choose?
E, B and BC flute are available. The choice depends on product weight, stacking and print needs — send the product size and weight, and we will confirm the structure with a free dieline.
Can corrugated shippers be printed?
Yes. Full-colour offset printing is available, so the outer shipper can carry your logo and branding as well as protect the contents.
How long does it take to reach the US?
Production for corrugated shippers is typically 10–15 days. Sea freight to Los Angeles / Long Beach adds about 15–20 days; air freight adds 5–7 days. Most US clients choose DDP, so duties are pre-paid.
Try your box
Pick a style and enter your inside dimensions, then send the exact specs to our factory on WhatsApp.
Customize Your Box Chat on WhatsApp